new motorway bridge to take the M74 motorway over the A749 Farmeloan Road Rutherglen Glasgow from the air
Buy this picture |
aerial photograph of showing construction of a new motorway bridge to take the M74 motorway over the A749 Farmeloan Road Rutherglen Glasgow. The 5mile long £692 million M74 northern extension was constructed between 2008 and 2011 and joined to the M8.
- Albums
- Visits
- 3551