Buy this picture |
aerial photograph of Great Yarmouth Outer Harbour and River Yare. The outer harbour was built in 2007 at a cost of £75m. it was originally planned to include passenger ferry terminal and a container terminal but these hopes have yet to be fulfilled. Two giant £30m container terminal cranes were imported from China were installed but then lay idle and were later removed.
- Visits
- 2581